Halden Solar Farm
Sample 1 / 10
Halden SolarInvestment teaser · November 2026

Clean power for 12,400 homes, ready to build.

A 48 MWp solar farm with 20 MW of battery storage on low-grade farmland in Suffolk. Consented, grid secured and seeking £14m of equity.

  • 48 MWp solar
  • 20 MW battery
  • First power 2028
Private and confidentialSample LiveDeck. Halden Solar is invented and every figure is fictional.

01 · At a glance

A shovel-ready site with the hard parts done.

Planning consent is granted, the grid offer is signed and the land is secured for 40 years. What is left is to build it.

An engineer in a hard hat and hi-vis jacket checking a solar panel at sunset
Commissioning checks on a comparable site
48 MWpsolar capacity
12,400homes powered a year
21,600 tCO2 avoided each year
£14mequity sought
Halden Solar · Investment teaserPrivate and confidential

02 · Investment summary

The opportunity in one page.

  • Consented in May 2026 with no conditions that affect the layout
  • Firm 33 kV grid connection, 1.2 km from the site
  • 65% of revenue contracted for the first 15 years
  • Experienced contractor appointed on a fixed-price build
Location
Halden, Suffolk
Capacity
48 MWp solarplus 20 MW / 40 MWh battery
Equity sought
£14m
Minimum commitment
£250,000
Target net return
9% to 11% a year
Structure
Single project company40-year lease, index-linked rent
First power
Q1 2028
Halden Solar · Investment teaserFigures are illustrative and invented

03 · The site

Tap the plan to explore.

  • Solar arrays
  • Battery
  • New hedgerow
  • Footpath
  • Phase 1

Tap a point on the plan to see what is there.

Halden Solar · Investment teaserPlan not to scale outside the key

04 · Your return

Drag to see your share.

Choose an investment and a scenario. Income is paid twice a year from the first full year of generation.

Base case assumes P50 generation and central power price forecasts. Upside assumes P50 generation and the high price case. Before fees and tax.

£250,000
Scenario
Income each year£23,000
Over ten years£230,000

Illustration only, using invented figures. Not a forecast or an offer.

Halden Solar · Investment teaserPrivate and confidential

05 · Revenue

Steady income, year after year.

Cumulative revenue from power sales and the battery, from first generation. Switch scenarios to compare.

    Source: Halden Solar financial model, version 4 (invented)Private and confidential

    06 · Programme

    From consent to first power.

    Press play to watch the programme unfold, or tap any stage.

    Halden Solar · Investment teaserDates are targets

    07 · The land

    Before and after.

    Drag across to compare the field today with the finished scheme, grazed by sheep and edged with wildflowers.

    Before: a ploughed arable field with a single oak tree and hedgerow
    Today 2028
    Halden Solar · Investment teaserImages are illustrative

    08 · Next steps

    Ready for the full picture?

    Tick off where you are. When you are ready, the investment team will send the full information memorandum and data room access.

    Halden Solar investment team invest@haldensolar.example In your LiveDeck, this is your own contact and call to action.

    0 of 5 done

    This document is a sample made by LiveDeck to show how an investment teaser can work. Halden Solar, its people and its figures are invented. It is not an offer or invitation to invest.